  92   SETB r/m8    4/5     (CF=1)
  93   SETAE r/m8   4/5     (CF=0)

  90   SETO r/m8    4/5     (OF=1)
  91   SETNO r/m8   4/5     (OF=0)

  9A   SETP r/m8    4/5     (PF=1)
  9B   SETPO r/m8   4/5     (PF=0)

  98   SETS r/m8    4/5     (SF=1)
  99   SETNS r/m8   4/5     (SF=0)

  94   SETE r/m8    4/5     (ZF=1)
  95   SETNE r/m8   4/5     (ZF=0)

  9D   SETGE r/m8   4/5     (SF=OF)
  9C   SETL r/m8    4/5     (SF<>OF)

  96   SETBE r/m8   4/5     (CF=1 or (ZF=1)
  97   SETA r/m8    4/5     (CF=0 and ZF=0)

  9E   SETLE r/m8   4/5     (ZF=1 and SF<>OF)
  9F   SETG r/m8    4/5     (ZF=0 or SF=OF)
  9E   SETNG r/m8   4/5     (ZF=1 or SF<>OF)

